Ship HVAC system refitting at V. Filanovsky oilfield Living Quarter Platform

Living Quarters Platform-2 shipboard and energy facility commissioning

Category Ongoing
Construction facility V. Filanovsky oilfield Living Quarter Platform
General customer OOO “Lukoil Nizhnevolzhskneft”
Start June 2019

HVAC system engineering documentation elaboration with the following construction and civil operations and commissioning.

List of performed operations:

  • Current HVAC system parameters measurement (air flow rate, refrigeration capacity, etc.)
  • Checking calculation on the basis of performed measurement
  • Identification of required refrigeration capacity and capacity to support required air microclimate parameters
  • Working documentation elaboration and its approval with the Customer and Russian Maritime Registry of Shipping
  • Elaboration of the documentation for refrigerant hose and drainages installation, wiring, power distribution and control panels refitting, connection diagrams, cable schedules, steel structure drawings for equipment installation.
  • Procurement and supply of required equipment, materials, spare parts and accessories for HVAC equipment installation and adjustment

 

Company presentation
Presentation